Mission Planning
Introduction This lab is a two-part lab. The first part is setting up and pre-flighting the Bramor C-Astral fixed wing UAV. The second part of the lab is working with the mission planning/monitoring software that the C-Astral utilizes. Pre-Flight Checklist The first part of pre-flighting comes before leaving the office. The included checklist book actually has a section called the Office Checklist. This checklist allows the pilot to ensure that every part of the flight kit is included in the case, batteries, tablet, and ground control station are charged, and that in general nothing has been left behind. Sometimes jobs can have flights that are an hour or more drive away, this checklist just helps the POC make sure that they haven't wasted half a day driving around only to realize they left something behind. The actual pre-flight of this aircraft is incredible strict and specific. It is a very expensive aircraft, therefore you would not want anything to go wrong. Followi